ACHIEVMENT

Water Supply provided by DMC


In existing water supply system of Durgapur town, Durgapur Municipal Corporation provides water supply to the major part. The infrastructure available with DMC includes treatment plant at Angadpur, Clear water Reservoir and Pump house at Angadpur, CWR and Booster pumping station at Piyala, Service Overhead reservoir at various localities, connecting rising main pipeline and distribution network from OHR.

The Treatment plant, Rising main pipeline, Booster Pumping stations, OHR and distribution network, which are in existence today, have been installed through the Public Health Engineering Directorate in two phases. Extension of the distribution network to cover added areas to meet shortfall in demand have been carried out by DMC from time to time.

01. PROJECT NAME 4MGD WATER SUPPLY PROJECT UNDER DURGAPUR MUNICIPAL CORPORATION
02. TOTAL PROJECT COST RS. 3086 LAKHS
03. TOTAL POPULATION BENEFITED 1.05 LAKH
04. SOURCE OF FUND D.M.C.’S OWN FUND
05. OVERHEAD TANK
  • City Centre Energy Park and surrounding area(3 Lakh Gallon capacity)
  • South of G.T. Road (2 Lakh Gallon capacity)
  • Srinagar Pally (1.8 Lakh Gallon capacity)
  • East of Link Road ( 2.6 Lakh Gallon capacity)
  • West of Link Road ( 2.6 Lakh Gallon capacity)
06. PIPELINE
  • Rising Main Pipe lines : 6.6 KM
  • Distribution Pipelines: 37 KM
07. IMPLEMENTING AGENCY DMC and Municipal Engineering Directorate jointly.
08. PRESENT STATUS Under Progress

Citizen Charter
Double Entry Accrual Based Accounting System
Birth & Death Certificate computerization system
Tax collection computerization system
Store computerization system
60% increase in own source revenue


Jawaharlal Nehru Nation Urban Renewal Mission ( Jnnurm )


Government of India has decided to launch Jawaharlal Nehru Nation Urban Renewal Mission (JNNURM) with an aim to encourage reforms and fast-track planned development of identified cities. The focus is majorly on efficiency in urban infrastructure and service delivery mechanisms, community participation and accountability of ULBs/parastatal agencies towards citizens. Solid Waste Management Best performing city.

Overview:

It would be worthwhile to note that there are two submissions under JNNURM, Sub-Mission-I, titled Urban Infrastructure and Governance (UIG), will be administered by the Ministry of Urban Development through the Sub-Mission Directorate to deal with up-gradation/renewal of basic infrastructure in the selected cities and towns and implementation of various reforms pertaining to improved municipal governance including sustenance of development activities.

The Sub-Mission-II, titled Basic Services for Urban Poor (BSUP), will be administered by the Ministry of Urban Employment and Poverty Alleviation through the Sub-Mission Directorate to deal exclusively for urban poor living in slum/squatter settlements in cities and towns. The focus of BSUP is to improve the living conditions of the urban poor by way of providing housing along with infrastructure, with a view to gradually removing slums/squatter settlement from cities and towns.

The Government of India has identified 63 cities from India based on population which will get the benefit of JNNURM. From West Bengal two cities have been identified namely Kolkata and Asansol. In Kolkata there are 42 ULBs including 3 Municipal Corporations and in Asansol there are 5 ULBs including 2 Municipal Corporations. Kolkata Metropolitan Development Authority has been selected as State Level Nodal Agency (SLNA) to monitor JNNURM projects both for UIG and BSUP.


BSUP Schemes of JNNURM under DMC


BSUP Phase-I

PROJECT NAME: Rehabilitation of slum in Durgapur
DATE OF SANCTION : 28.11.2006
PROJECT COST (RS. IN LAKHS : 10601.62 LAKHS
NUMBER OF DWELLING UNITS : 4000
Infrastructure Component
1. Water Supply
2. Drainage
3. C.C Road
4. Street Lighting
5. Community Hall
6. Community Toilet
7. Parks
FUNDING PATTERN (Rs. in Lakh)
GOVT. OF INDIA Rs. 5300.81
GOVT. OF W.B. Rs. 3180.49
ULB Rs. 1208.32
BENEFICIARY Rs. 912.00
TOTAL Rs. 10601.62
This project is in near to completion.
TECHNICAL ASSISTANCE : MED/ADDA
NODAL AGENCY : KMDA

BSUP Phase-II

PROJECT NAME: BSUP Scheme for the town of Durgapur Phase II
DATE OF SANCTION : 13.02.2009
PROJECT COST (RS. IN LAKHS : 1154.92 LAKHS
NUMBER OF DWELLING UNITS : 400
COMPLETED: 400
Infrastructure Component
  • Water Supply
  • Drainage
  • C.C Road
  • Street Lighting
  • Community Hall
  • Informal Sector Market
  • Boundary Wall
FUNDING PATTERN (Rs. in Lakh)
GOVT. OF INDIA 577.46
GOVT. OF W.B. 346.48
ULB 150.47
BENEFICIARY 80.51
TOTAL 1154.92
Project has been Completed.
TECHNICAL ASSISTANCE : MED/ADDA
NODAL AGENCY : KMDA

BSUP Phase-IV

PROJECT NAME: BSUP Scheme for Durgapur, Phase-IV
DATE OF SANCTION : 14.03.2011
PROJECT COST (RS. IN LAKHS : 3578.29 LAKHS
NUMBER OF DWELLING UNITS : 912
Infrastructure Component
  • Water Supply
  • Drainage
  • C.C Road
  • Street Lighting
  • Community Hall
FUNDING PATTERN (Rs. in Lakh)
GOVT. OF INDIA 1789.15
GOVT. OF W.B. 1306.89
BENEFICIARY 482.26
TOTAL 3578.30
This project is under construction.
TECHNICAL ASSISTANCE : MED/ADDA
NODAL AGENCY : KMDA

Water(JNNURM) Ph-II

PROJECT NAME Water Supply Augmentation for Durgapur Municipal Area within Asansol Urban Area
DATE OF SANCTION 28.06.2006
LIKELY IMPACT The existing 7 MGD plant is grossly inadequate to cater to the requirement of the region which will be augmented further by a new 7 MGD plant.
AREA COVERED Total area Covered 47.30 Sq. Km.
Zone I (Angadpur)- Ward No 36(Part), 37(Part), 38(Part),
Zone II (BI More)- Ward No 24(Part), 25(Part), 26(Part),
Zone III (Kamalpur)- Ward No 1 & Ward No 2
POPULATION TO BE BENEFITTED 1.07 Lakhs
MAJOR COMPONENTS :
  • Augmentation of the raw water pumping capacity.
  • Installation of one clariflocculator.
  • Changes in filter media and ancillary electro mechanical works in the filter house.
  • Construction of additional capacity of CWR to the extent of 3000 m3.
  • Augmentation of high lift pumping capacity of the existing CWR. The water from high lift CWR will be fed both to industrial and domestic areas for which two seperate rising main have been considered.
  • Augmentation of the capacity of intermediate reservoir at Piyala by constructing UGR of 1200 m3. Construction of two overhead resevoirs each of 2 lakh gallon capacity, under Zone II & Zone III, which will be fed from augmented CWR at Piyala. Construction of one OHR 1 Lakh gallon capacity under Zone I.
  • Augmentation of pumping capacity of the intermediate pumping station at Piyala.
  • Distribution network under Zone II & Zone III, the domestic area to be fed from the proposed three OHRs.
  • Installation of a laboratory in the Treatment Plant Complex.
  • Pipeline:
    • Rising main: 17.42 Km
    • Distribution: 101.71 Km
APPROVED PROJECT COST (Rs. in Crore) 28.78
FUND SHARING (Rs. in Crore) GoI 14.39 State 14.39
FUND RELEASED (Rs. in Crore) GoI 14.39 State 14.39
IMPLEMENTATION PERIOD 21 months
IMPLEMENTING AGENCY Public Health Engineering Directorate
PRESENT STATUS Project has been commissioned

Water(JNNURM) Ph-III

PROJECT NAME 15 MGD Water Supply Project
DATE OF SANCTION 11.12.2009
POPULATION TO BE BENEFITTED 1.135 Lakhs
MAJOR COMPONENTS Overhead Reservoir i)Existing Bidhan Nagar Ward-26 3 Lakhs Gallon Capacity
ii)Bidhan Nagar Extension:
iii)Sagarbhanga Area Ward 28,29 & 30 4.3 Lakhs Gallon Capacity
iv) Sramik Nagar Area 41,42 & 43 5.8 Lakhs Gallon Capacity
Bulk Consumer i)Aerotropolis 40 Lakhs Gallon
ii) New Township at City Centre 10 Lakhs Gallon
iii) SPS Synergy Medicity 10 Lakhs Gallon
iv) N.I.T. 09 Lakhs Gallon
v) MAMC Township 15 Lakhs Gallon
vi) Durgapur Cement Works 50 thousand Gallon
PIPELINE i) Rising Main Pipeline 37.09 Km
ii) Distribution Pipelines 150.24 KM
APPROVED PROJECT COST (Rs. in Lakh) Rs. 12644.04
FUND PATTERN
Govt of India(50%) Rs. 6322.02 Lakhs
Govt of West Bengal(35%) Rs. 4425.42 Lakhs
UC STATUS 4th and Final Installment received
ADDA (10%) Rs. 1264.40 Lakhs
DMC(5%) Rs. 632.20 Lakhs
Total Rs. 12644.04 Lakha
IMPLEMENTING AGENCY ADDA
PRESENT STATUS Under Construction

Award For Excellence In Municipal Reforms And Service Delivery Improvement : JNNURM


The Ministry of Urban Development has recognised Performance Awards for JNNURM ULBs for their efforts on achievement in areas of urban reforms and service delivery achievements under the Urban Infrastructure Governance (UIG) sub-mission. This Award not only recognizes achievements in basic services improvements, but also recognizes achievements of ULBs in strengthening governance and finance functions, creating effective partnerships with the private sector towards more efficient functioning, and undertaking environment friendly initiatives towards adopting a sustainable development approach. The Hon`ble Minister Jaipal Reddy, handed the Performance Awards on December 3, 2008 to:

Categories Cities
Best performing city Runner up city
Category 1: Achievement for Improvement in Basic Services
Solid Waste Management Durgapur Pune